How do I know NEB is done and ready to plot the barrier?
Posted: Fri Feb 01, 2008 4:01 am
Hello All,
How do we know that a NEB run is done?
Do I check it in the OUTCAR file that all the forces are less than or equal to 0.03 ev/Angst.
when can we say that a NEB run is fully converged and ready to plot the barrier using
images Vs Eo(sigma->0).
I did a NEB run with 3 images and then copied CONTCAR to POSCAR for respective images and re-ran the NEB. I repeated the above procedure for three times. Every time I checked the OUTCAR file forces for each image where some of the forces reach below 0.03 ev/Angst and some do not.
Is this the right method to do??
how can I make all the forces less than 0.03 ?
Is this criterion show that the NEB is fully converged and ready to plot?
Is there any criterion that should be met.
Here is my INCAR file
SYSTEM = Si bulk
ENCUT = 150.0 eV,
PREC = High
IMAGES = 3
SPRING = -5
NPAR = 12
EDIFFG = -0.005
EDIFF = 0.0001
POTIM = 0.05
IBRION = 3
LREAL = Auto
NSW = 500
LCHARG = .FALSE.
LVTOT = .FALSE.
Please reply.
Thank you,
Ashok
How do we know that a NEB run is done?
Do I check it in the OUTCAR file that all the forces are less than or equal to 0.03 ev/Angst.
when can we say that a NEB run is fully converged and ready to plot the barrier using
images Vs Eo(sigma->0).
I did a NEB run with 3 images and then copied CONTCAR to POSCAR for respective images and re-ran the NEB. I repeated the above procedure for three times. Every time I checked the OUTCAR file forces for each image where some of the forces reach below 0.03 ev/Angst and some do not.
Is this the right method to do??
how can I make all the forces less than 0.03 ?
Is this criterion show that the NEB is fully converged and ready to plot?
Is there any criterion that should be met.
Here is my INCAR file
SYSTEM = Si bulk
ENCUT = 150.0 eV,
PREC = High
IMAGES = 3
SPRING = -5
NPAR = 12
EDIFFG = -0.005
EDIFF = 0.0001
POTIM = 0.05
IBRION = 3
LREAL = Auto
NSW = 500
LCHARG = .FALSE.
LVTOT = .FALSE.
Please reply.
Thank you,
Ashok