Continuation of Noncollinear jobs

Queries about input and output files, running specific calculations, etc.


Moderators: Global Moderator, Moderator

Post Reply
Message
Author
bth20
Newbie
Newbie
Posts: 22
Joined: Tue May 10, 2005 9:57 am

Continuation of Noncollinear jobs

#1 Post by bth20 » Wed Aug 31, 2005 4:37 pm

Hiya,

I am performing many noncollinear calculations in which both the ions and the magnetization density relax simultaneously. Unfortunately the jobs are often timed out by the local system.

Is it possible to begin a continuation job when this happens? I know this is possible for a collinear job using CONTCAR, but I think noncollinear jobs are different because one also needs to begin again with the most recent state of magnetization.

Any other ideas on how to get around this problem would also be much appreciated.

Thanks

Ben
Last edited by bth20 on Wed Aug 31, 2005 4:37 pm, edited 1 time in total.

Veronika
Jr. Member
Jr. Member
Posts: 70
Joined: Wed Feb 02, 2005 4:14 pm

Continuation of Noncollinear jobs

#2 Post by Veronika » Thu Sep 01, 2005 7:38 am

Make the jobs shorter (fewer NSW steps) and continue from the last CONTCAR using also the CHGCAR and the WAVECAR written (ISTART and ICHARG = 1), then you have also the last magnetic configuration considered.
Last edited by Veronika on Thu Sep 01, 2005 7:38 am, edited 1 time in total.

Post Reply